Pre-shipment quality · Guangzhou
QC before your order leaves the factory
Incoming, assembly, aging, and outbound checks stay documented before freight books.
Inspection sequence
Four QC checkpoints
Four checks in order. Use this list when you confirm a trial or wholesale PO.
-
Incoming inspection
Materials and components checked against the approved BOM.
-
Assembly check
Build quality and functional assembly verified on the line.
-
Aging test
Burn-in and run tests before packing.
-
Outbound inspection
Final release against packing list and carton marks.
Quote attachments
What you can ask for on a quote
Importers usually need proof of what was checked, not a verbal “passed.” Tell us which checkpoints matter for your market.
- Electrical safety Insulation and leakage boundaries aligned to the destination plug and voltage build.
- Pressure stability Extraction pressure watched across test cycles for commercial and home espresso models.
- Thermal recovery Heat-up and recovery checked so machines behave under service loads, not only first pour.
- Packing & accessories Manuals, spare parts lists, and carton marks confirmed against your packing note.
Ready to attach QC to your next order?
Share models, destination market, and quantity. We will confirm stock, inspection scope, and which cert paths apply.